Agilent Technologies N2620A User Manual
Page 94
Advertising

76
N2620A User’s Guide
2
Network Testing with the FrameScope Pro
5
Press Start to begin the test.
After pressing Start, the master FrameScope Pro starts the
activation and synchronization procedure with the target
FrameScope Pro by doing the following actions.
a
Search (if enabled) and check the status of the slave
FrameScope Pro.
b
Activate the slave FrameScope Pro if the device is in idle
mode.
c
Set up the slave FrameScope Pro parameters by
synchronizing the master and slave FrameScope Pro units
for the test.
d
Start the test.
e
Query test results at the end of the test.
f
Stop the test.
If the selected target is a loopback device, all test setups are
performed in the master FrameScope Pro. There will be no
authentication synchronization setup.
Advertising