6 cnt ac-j z configuration operations, Configuration workflow, Defining fibre-channel port attributes – HP XP7 Storage User Manual

Page 61

Advertising
background image

6 Cnt Ac-J Z configuration operations

This chapter provides instructions for configuring Continuous Access Journal Z.

Configuration workflow

Setup for Continuous Access Journal Z using Remote Web Console consist of the following
operations. You must have Storage Administrator (Remote Copy) role to perform Continuous Access
Journal Z operations.
1.

Navigate to Remote Web Console.

2.

Define the fibre-channel port attributes. See

“Defining fibre-channel port attributes ” (page 61)

,

below.

3.

Set up remote paths between the primary and secondary systems. See

“Configuring primary

and secondary systems for Cnt Ac-J Z ” (page 62)

4.

Register journal volumes in a journal. See

“Creating journals and adding journal volumes ”

(page 64)

5.

Assign an MP Blade to a journal. See

“Assigning an MP blade to a journal” (page 67)

Before the initial copy, you may also want to add more remote paths. See

“Configuring additional

remote paths ” (page 64)

. You can also specify the number of volumes to copy at one time. For

information, see

“Changing number of copies allowed per initial copy operation” (page 90)

.

Be sure to check the prerequisites for each procedure. Some tasks are performed from both primary
and secondary systems. Other tasks are performed from one or the other.

Defining fibre-channel port attributes

Initiator, and RCU target ports must be set up on the primary and secondary systems for Continuous
Access Journal Z command and data transfer.

Prerequisite information

•

Before a fiber channel target port can be changed to an initiator port, the following must be
performed:

◦

Disconnect the port from the host.

◦

Release all affected pairs.

◦

Delete all remote paths from the initiator port to the secondary system.

◦

Remove all cables to the port.

•

Before a fiber channel initiator port can be changed to target or RCU target, the following
must be performed:

◦

Release all affected pair.

◦

Delete all remote paths from the initiator port to the secondary system.

◦

After remote paths are deleted, remove the cables connecting the primary system to the
secondary system.

•

Check that the number of hosts connected to a target port is not more that the maximum of
128 to avoid disconnection.

See

“Planning ports for data transfer ” (page 45)

for information on target, initiator, and RCU

target ports and to determine the number of initiator and RCU target ports required by your system.

Procedure 5 To define port attributes

1.

In the Storage System tree, click Ports/Host Groups.

Configuration workflow

61

Advertising
This manual is related to the following products: