Festo Электроцилиндр ESBF User Manual

Page 18

Advertising
background image

ESBF-BS

18

Festo – ESBF-BS – 1201NH English

Pressurising and exhausting the pressure compensation opening for variant ESBF-...-S1/F1:

Screw a G1/8 fitting into the thread

4.

Use a tube for the supply and exhaust of fresh air.

The exhausting process should be conducted in a protected

area (free from dust and moisture) or in a large pressure

reservoir. Alternatively, a slight excess pressure

(max. 0.2 bar) can be applied as sealing air.

Fig. 5

4

Fitting in a vertical or sloping position:

Warning

Uncontrolled moving masses can cause personal

injury and material damage (risk of crushing).

If there is a spindle nut fracture inside the ESBF or

a toothed belt breaks

when using parallel kit EAMM-U (e.g. due to wear),

the effective load will fall down.

Check whether additional external safety

measures against damage are required

(e.g. toothed latches or moveable bolts). In this

way you can prevent the work mass from slid-

ing down.

Examine the toothed belt of the parallel kit reg-

ularly for wear

(

assembly instructions for the parallel kit).

Fig. 6

Installing the effective load

Place the centre of gravity of the effective load, if possible,

centrally to the piston rod.

When securing the effective load make sure that no torque

is transferred to the piston rod.

The wrench flat

7 can be used to exert counter pressure.

Secure the effective load to the piston rod.

The piston rod will bend depending on the effective load

(

Appendix 13 Characteristic curves).

7

Fig. 7

Size

63

80

100

Piston rod thread

Male thread

M16x 1.5

M20x1.5

M20x1.5

Female thread

M10

M12

M12

Width across flats

7

ß

[mm]

17

22

22

Tab. 2

Advertising