Hardware Installation

This chapter describes the hardware and cable installation tasks required to
integrate the NEAX 2400 MCI switch with an INTUITY System through a switch
integration d evice (SID). Before you proceed with the instructions in this chapter,
verify that the hardware has been installed and that all required steps have been
completed on one of the following checklists:

INTUITY MAP/5 Installation Checklist, 585-310-147

INTUITY MAP/40 Installation Checklist, 585-310-141

INTUITY MAP/100 Installation Checklist, 585-310-137

This chapter covers the installation of all integration-related hardware
components. The tasks must be performed by the AT&T installation technician,
the customer, or the customer’s switch technician. Each task provides an
explanation of who should perform the task.

The hardware installation tasks covered in this chapter include:

Connect an analog line to the modem

Connect the MCI line to the switch

Connect the MCI cable to the A25B cable

Connect the Null cable and the Y-cable to the SID

Connect the SID to the INTUITY system

Connect the SID power cord

Continue with the instructions on the next page to install the hardware.