AT&T 2400 User Manual

Page 88

Advertising
background image

7-18

Issue 2 December 1995

NEAX 2400 Switch Administration

5. Look at the value in the DATA field and write the value on the following line

NOTE:

Do not change the value in the DATA field until you consult with
your switch administrator. This index contains other fields that
control features not related to MCI.

6. Enter 01 in the DATA field.

You have completed the NEAX 2400 MCI switch administration. Proceed to
Chapter 8, "Switch Integration Device Administration", to configure the switch
integration device.

Current DATA value: _________

Advertising