AT&T 2400 User Manual

Page 48

Advertising
background image

4-6

Issue 2 December 1995

Hardware Installation

NOTE

:

Recommended Default Settings:

If you use port 0, configure switches 01 and 02. If you use
port 1, configure switches 11 and 12.

Standard switch settings for SW01 or SW11 are 1 ON, 2 OFF,
3 ON, 4 OFF, 5 OFF, 6 OFF, 7 ON, and 8 ON.

Standard switch settings for SW02 or SW12 are 1 ON, 2 ON,
3 ON, 4 ON, 5 ON, 6 ON, 7 ON, and 8 OFF.

3. Connect one end of a 25-pair cable to the MCI I/O port on the switch.

To create the cable, refer to Table 4-4 for the correct cable pinouts.

Table 4-3.

MCI I/O Port DIP-Switch SW02 or SW12 Settings for Switches 1
through 8

Switch
Number

Setting

Function

1

ON

When PB lead is - terminal is busy

OFF

When PB lead is + terminal is busy

2

ON

DTR signal is always ON

OFF

DTR signal is controlled by the CPU

3

ON

DSR signal is not provided

OFF

DSR signal is provided

4

ON

CD is not provided

OFF

CD is provided

5

ON

CS is not provided

OFF

CS is provided

6

ON

CI is not provided

OFF

CI is provided

7

ON

PB signal is not provided

OFF

PB signal is provided

8

OFF

Not used

Advertising