Connect the null cable and the y-cable to the sid, Connect the null cable and the, Y-cable to the sid – AT&T 2400 User Manual

Page 50

Advertising
background image

4-8

Issue 2 December 1995

Hardware Installation

Connect the Null Cable and the
Y-Cable to the SID

The AT&T installation technician, the customer, or the customer’s switch
technician must complete this task.

The NEAX 2400 switch communicates with the SID through a Message Center
Interface (MCI) link. To connect the SID to the MCI digital port, you must connect
a Null cable and a Y-cable to the SID. Use the following instructions to connect
the cables to the SID.

1. Connect one end of the Null cable to the 25-pin Link B on the SID, shown

in Figure 4-3.

2. Connect Port 0 of the Y-cable to the free end of the Null cable.

NOTE

:

Port 1 on the Y-cable is not used for any connections with this
integration.

Proceed to the next section.

Figure 4-3.

Back View of the SID

25 Pin

25 Pin

(Fan Outlet)

Link A

Link B

Diag

Net B

Net A

Line B

Line A

Modem

115-230V AC

50/60 Hz

Power

Cord

Outlet

(Male)

Power

Switch

Advertising