Building wiring – AT&T System 25 User Manual

Page 46

Advertising
background image

INSTALLATION

Building Wiring

Building (station) wiring (must be 24 AWG or heavier) from voice and data

terminals to the equipment location should already be in place. System 25
wiring requires that 4-pair circuits be distributed from the equipment location
to each station’s wall jack.

The SIP hardware (Figures 2-2 through 2-6),

designed specifically for this purpose, is furnished with each system. Except

in extraordinary circumstances, this cross-connect hardware must be used.

In unusual circumstances where the 617A Panels are not used and some
other cross-connect equipment that does not provide a modular jack interface

to the port circuits is used, separate 4-pair circuits must be run for the voice
and data terminal at the workstation.

All examples and instructions in this

The station wiring terminations in

manual assume

the equipment

that a SIP is used.

area should have been

labeled to indicate the room location and jack number of the other end of the
line. When SIP connections are made, the connection information should be

entered on the Voice and Data Station Records Form (see Install Equipment
Room Station Cabling
in this part for details).

2-22

Advertising