Initialize system, Install cross-connect equipment – AT&T System 25 User Manual

Page 67

Advertising
background image

INSTALLATION

Initialize System

Instructions for initializing the system

(based on the completed

implementation forms) are provided in the Administration Manual
(555-540-500).

Note:

Before trunks using DS1 Signaling are administered, all link
level parameters such as signaling and framing and all link

level alarms must be cleared. If this is not possible, PBXs at
each end will not work.

If this condition exists, clear a

maintenance busy condition that exists at each end.

INSTALL CROSS-CONNECT EQUIPMENT

Before starting, familiarize yourself with the following equipment described in

CROSS-CONNECT EQUIPMENT DESCRIPTION:

Trunk Access Equipment (TAE)

Station

700 A-110-B1 -25 or 700A-66-B1-25 Wiring Jacks

10B Emergency Transfer Units

Interconnect Panel (SIP)

617A Panels

858A or Z210A2 Adapters

50A Fanning Strips.

Figure 2-16 shows a typical SIP and TAE backboard layout. Figure 2-17
shows an alternate layout that can be used when horizontal wall space is
limited. These layouts can be reversed when the switch cabinet(s) must be
installed to the right of the backboard.

2-43

Advertising