Bryant 548J User Manual

Page 22

Advertising
background image

22

C09276

Fig. 27 -- Defrost Control Board (DFB) Location

Table 9 – 548J Defrost Board I/O and Jumper Configurations

Inputs

Point Name

Type of I/O

Connection Pin Number

Unit Connection

Note

G Fan

DI, 24---vac

P2---3

LCTB---G

Y1 Cool 1

DI, 24---vac

P2---5

LCTB---Y1

Y2 Cool 2

DI, 24---vac

P2---4

LCTB---Y2

W1 Heat 1

DI, 24---vac

P2---7

LCTB---W1

W2 Heat 2

DI, 24---vac

P2---6

LCTB---W2

R Power

24---vac

P3---1

CONTL BRD---8

C Common

24---vac

P3---2

CONTL BRD---4

DFT1

DI, 24---vac

DFT---1 to DFT---1

DFT 2

DI, 24---vac

DFT---2 to DFT---2

Outputs

Point Name

Type of I/O

Connection Pin Number

Unit Connection

Note

IFO Fan On

DO, 24---vac

P3---9

REHEAT---2

OF OD Fan On

DO, 24---vac

OF

OFR

RVS1

DO, 24---vac

P3---7 to P3---5

Energize in COOL

RVS2

DO, 24---vac

P3---6 to P3---4

Energize in COOL

COMP 1

DO, 24---vac

P3---10

FPT --- REHEAT---6

COMP 2

DO, 24---vac

P3---8

REHEAT---8

HEAT 2

DO, 24---vac

E---HEAT

HC---1 (TB4---1)

COM

24---vac

P3---3

HC---1 (TB4---3)

Configuration

Point Name

Type of I/O

Connection Pin Number

Unit Connection

Note

Select Jumper

24---vac

P1---1

2 Compressor

24---vac

P1---3

Use for 548J***D

Speed--Up Configuration

Point Name

Type of I/O

Connection Pin Number

Unit Connection

Note

Speed---Up Jumper

JMP17

Speed---Up Jumper

JMP18

Jumper for 1--3 secs: Factory Test, defrost runs for 9 secs
Jumper for 5--20 secs: Forced Defrost, defrost runs for 30 secs if DFT2 is open

Reversing valve control — The DFB has two outputs for

unit reversing valve control. Operation of the reversing

valves is based on internal logic; this application does not

use an “O” or “B” signal to determine reversing valve

position. Reversing valves are energized during the

Cooling stages and de--energized during Heating cycles.

Once energized at the start of a Cooling stage, the

reversing valve will remain energized until the next

Heating cycle demand is received. Once de--energized at

the start of a Heating cycle, the reversing valves will

remain de--energized until the next Cooling stage is

initiated.

Compressor control — The DFB receives inputs

indicating Stage 1 Cooling, Stage 2 Cooling (sizes 08 and

09 only) and Stage 1 Heating from the space thermostat or

unit control system (RTU--MP); it generates commands to

start compressors with or without reversing valve

operation to produce Stage 1 Cooling (one compressor),

Stage 2 Cooling (both compressors run) or Stage 1

Heating (both compressors run).

548J

Advertising