JLG X17J Plus Operator Manual User Manual

Page 118

Advertising
background image

HATZ DIESEL ENGINE

* First operation.
** At least every 3 months.
*** At least every 5 years.
As regards complete service of the engine, see the manual supplied by the engine manufac‑
turer or download it from the website:

PART

INTERVENTION

BEFORE

STARTING

AS NEEDED

INTERVAL (HOURS)

10

50

100

250

500

1000

2000

DRY AIR FILTER

CHECK, CLEAN

•

CHANGE

•

ENGINE OIL

CHECK LEVEL

•

•

CHANGE

•

*

•

ENGINE OIL FILTER

CLEAN

•

CHANGE

•

FUEL FILTER

CLEAN

•

CHANGE

•

WATER SEPARATOR

CLEAN AND DRAIN

WATER

•

•

*

•

COOLING SYSTEM

CHECK FLUID LEVEL

•

TOP UP/CHANGE

FLUID

•

HYDRAULIC OIL

CHECK LEVEL

•

CHANGE

•

HYDRAULIC OIL

FILTER

CHANGE CARTRIDGE

•

*

•

ARTICULATED JOINT

POINTS

GREASE

•

*

•

BATTERY

CHECK ELECTROLYTE

LEVEL

•

•

REDUCTION GEAR

OIL

CHECK LEVEL

•

CHANGE

•

*

•

MACHINE

GENERAL PERIODICAL

CHECKS

•

•

*

EXTENSION ARM

INTERNAL SLIDING

RING

CHECK WEAR

•

CHANGE

•

TURNTABLE BOLT

TIGHTENING

CHECK

•

*

•

NUT FIXING PINS

BASKET

CHECK TORQUE

200 Nm

•

#

X17JPR0020413

114

BOOM LIFT MODELS X17JPLUS

JLG

Advertising