Page 111: Dimension of sheaves when new -9

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121607

– JLG Lift –

4-9

16.

Remove fly boom section from mid section using an
overhead crane or suitable lifting device.

NOTE: When removing fly boom section from mid boom section,

retract wire rope must be dragged along with fly boom sec-
tion.

17.

Remove hardware which secures wear pads to aft end of
fly boom section. Remove wear pads from top, sides,
and bottom of fly boom section.

18.

When removing wire rope from fly boom section, push
cable into fly boom. Route wire rope back through holes
in side of fly boom section.

Figure 4-16. Wire Rope Routing Disassembly

Inspection

NOTE: Refer to guidelines established in Section 2 - General when

inspecting pins and bearings.

1.

Inspect all sheaves (extend and retract wire ropes and
telescope cylinder) for excessive groove wear, burrs, or
other damage. Replace sheaves as necessary.

NOTE: Use a groove gauge to check size, contour, and amount of

wear. Replace sheave if worn as shown in the following
drawing.

Figure 4-17. Dimension of Sheaves When New