Track tensioning, Rubber track pad installation – JLG 600SC_660SJC Service Manual User Manual

Page 42

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3-6

– JLG Lift –

3121607

PINS AND BUSHINGS MUST BE WELL LUBRICATED DURING ASSEMBLY.

4.

Apply anti-seize compound to pin. Line up end links.
start pin in hole by driving with a hammer.

5.

Place portable power pin press over track and pin. place
washers in press ends. Carefully press in track pin.

6.

Re-assemble four track shoes to assembled links.

7.

Torque track shoe bolts to 65 ft-lb, +6 (91 Nm, +8.4), then
tighten 1/3 turn (120°) further.

Track tensioning

1.

Using special grease fitting tool (P/N 83813109), pump
in grease to add tension to track.

2.

Check for 0.781 in (19.8 mm) tension between idler &
carrier roller with level and gage. Remove special fitting.

Rubber Track Pad Installation

1.

Seat rubber track pad over center rib of steel track.

2.

Apply JLG Thread Locking Compound PN 0100011 to
retaining plate bolts. Install bolts and flat washers to end
of rubber pad.

3.

Torque bolts to 70 ft-lb (97 Nm).

Advertising