6 articulating jib boom, Removal, Disassembly – JLG 600SC_660SJC Service Manual User Manual

Page 116: Inspection, Articulating jib boom -14, Removal -14 disassembly -14 inspection -14, Articulating jib boom components -14, 6 articulating jib boom removal

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-14

– JLG Lift –

3121607

4.6

ARTICULATING JIB BOOM

Removal

1.

For platform/support removal see platform/support
removal diagram. See Section 4-1., Location of Compo-
nents - Platform Support
.

2.

Position articulating jib boom level with ground.

3.

Remove mounting hardware from slave leveling cylin-
der pin #1. Using a suitable brass drift and hammer,
remove cylinder pin from articulating jib boom.

Figure 4-22. Articulating Jib Boom Components

4.

Remove mounting hardware from articulating jib boom
pivot pin #2. Using a suitable brass drift and hammer,
remove pivot pin from boom assembly.

Disassembly

1.

Remove mounting hardware from articulating jib boom
pivot pins #3 and #4. Using a suitable brass drift and
hammer, remove the pins from articulating jib boom
pivot weldment.

2.

Remove mounting hardware from rotator support pins
#5 and #6. Using a suitable brass drift and hammer,
remove pins from rotator support.

3.

Remove mounting hardware from lift cylinder pin #7.
Using a suitable brass drift and hammer, remove the cyl-
inder pin from articulating jib boom.

Inspection

NOTE: Refer to Section 2 - General, when inspecting pins and

bearings.

1.

Inspect articulating fly boom pivot pin for wear, scoring,
tapering and ovality, or other damage. Replace pins as
necessary.

2.

Inspect articulating fly boom pivot attach points for
scoring, tapering and ovality, or other damage. Replace
pins as necessary.

3.

Inspect inner diameter of articulating fly boom pivot
bearings for scoring, distortion, wear, or other damage.
Replace bearings as necessary.

4.

Inspect lift cylinder attach pin for wear, scoring, tapering
and ovality, or other damage. Ensure pin surfaces are
protected prior to installation. Replace pins as neces-
sary.

5.

Inspect inner diameter of rotator attach point bearings
for scoring, distortion, wear, or other damage. Replace
bearing as necessary.

6.

Inspect all threaded components for damage such as
stretching, thread deformation, or twisting. Replace as
necessary.

7.

Inspect structural units of articulating jib boom assem-
bly for bending, cracking, separation of welds, or other
damage. Replace boom sections as necessary.

Advertising