5 function speeds, Machine orientation when doing speed tests, Test notes – JLG 600SC_660SJC Service Manual User Manual

Page 16: 6 torque requirements, Function speeds -2, Torque requirements -2, Function speeds (in seconds) -2

Advertising
background image

SECTION 1 - SPECIFICATIONS

1-2

– JLG Lift –

3121607

1.5

FUNCTION SPEEDS

Machine Orientation When Doing Speed Tests

Lift: Boom retracted. Telescope retracted. Lift up, record time,
Lift down, record time.

Swing: Boom at full elevation. Telescope retracted. Swing
turntable off center and stop. Swing opposite direction and
start test when centered. This eliminates controller ramp up
and ramp down affecting times.

Telescope: Boom at full elevation; Telescope retracted; Tele-
scope out, record time. Telescope In, record time.

Tracking: Test to be done on a graveled level surface. Position
machine at a reference point (no steer correction) driving at
high speed. Results should be 4 - 6 ft (1.2 - 1.8 m) tracking error
at 200 ft (61 m).

Drive: Test to be done on a graveled level surface. Set Drive
Select Switch to High Speed. Start approximately 10 ft (7.6 m)
from starting point so unit is at maximum speed when starting
test. Record results for a 200 ft. (61 m) course. Drive forward,
record time. Drive reverse, record time.

Drive (Out of Transport): Test should be done on a graveled
level surface. Set Drive Select Switch to High Engine, High
Speed. Select Platform Speed Knob out of creep speed. Raise
boom above horizontal. Results should be recorded for a 50 ft
(15.2 m) course. Drive forward, record time. Drive reverse,
record time.

Platform Rotate: Platform level and completely rotated one
direction. Rotate opposite direction, record time. Rotate other
direction, record time.

Jib: Platform level and centered with boom. Start with Jib
down. Jib up, record time. Jib down, record time.

Test Notes

1.

Start stop watch with function, not with controller or
switch.

2.

All speed tests are run from platform. Speeds do not
reflect ground control operation.

3.

Platform speed knob control must be at full speed
(turned clockwise completely).

4.

Test with oil temperature above 100° F (38° C). Function
speeds vary if hydraulic oil is cold and thick.

5.

Some flow control functions may not work with speed
knob clicked into creep position.

1.6

TORQUE REQUIREMENTS

Table 1-4. Function Speeds (In Seconds)

Function

600SC

660SJC

Lift Up

46 - 60

46 -60

Lift Down

33 - 43

33 - 43

Swing Right & Left*

79 - 101

79 - 101

Telescope In

22 - 33

25 - 33

Telescope Out

50 - 67

50 - 67

Platform Rotate Right & Left**

16 - 25

25-32

Jib Up

N/A

22 - 34

Jib Down

N/A

16 - 26

Drive Forward & Reverse

85-90

(1.55 MPH)

85-90

(1.55 MPH)

Drive (Out of Transport)
Forward & Reverse

80-85

(.40 MPH)

80-85

(.40 MPH)

*Max 10% Difference Between Left & Right

**Max 15% Difference Between Left & Right

Table 1-5. Torque Requirements

Description

Torque Value (Dry)

Interval

Hours

Bearing To Chassis

190 ft. lbs.

(258 Nm)

50/600*

Bearing To Turntable

190 ft. lbs.

(258 Nm)

50/600*

Wire Rope

15 ft. lbs (20 Nm)

150

Wheel Lugs

170 ft. lbs (231 Nm)

150

Engine Mounting Bolts

165 ft. lbs. (231 Nm)

A/R

Engine Manifold Mount-
ing Bolts

30 ft. lbs. (42 Nm)

A/R

*Check swing bearing bolts after first 50 hours of operation
and every 600 hours thereafter. (See Swing Bearing in Section
3.)

Advertising