Chassis service notes - 2 of 2 -3 – JLG 600SC_660SJC Service Manual User Manual

Page 39

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3121607

– JLG Lift –

3-3

Figure 3-3. Chassis Service Notes - 2 of 2

1

Track tension adjustment to be made between the idler and carrier roller: 0.781 in (19.8 mm)

2

Anti-Seize Compound to be used on master link pin before assembly. Torque Pad bolts over master link to 65 ft-lbs
+6,-6 then tighten 1/3 (120

°)turn further.

3

Fill Plug

4

Check oil level of left & right crawler drives (0.69 Gal [2.6 L] grade 90 Gear Oil)

5

Drain Plug

6

Torque to 200 ft-lb, +15 -0 (280 Nm, +21 -0)

7

Use Gradall 8381-3109 Large Button Head Grease Fitting Adapter to Adjust Tracks

8

Torque to 65 ft-lb, +10 -0 (91 Nm, +15 -0)

9

Torque to 340 ft-lb, +25 -0 (476 Nm, +35 -0)

10

Offset in Idler Spring from centerline of Idler to be oriented down.

11

Torque to 165 ft-lb, +15 -0 (231 Nm, +21 -0)

12

Apply Anti-Seize Compound to both mounting pilots Drive Motors

13

Torque to 230 ft-lb, +15 -0 (322 Nm, +21 -0)

14

Torque to 93 ft-lb, +10 -0 (130 Nm, +14 -0)

15

Torque to 53 ft-lb, +5 -0 (74 Nm, +7 -0)

Advertising