Carrier disassembly, Carrier disassembly -29 – JLG 600SC_660SJC Service Manual User Manual

Page 65

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3121607

– JLG Lift –

3-29

Carrier Disassembly

1.

Using a 3/16" punch drive Roll Pin (3G) holding Planet
Shaft (3E) in Carrier (3A) in Planet Shaft (3E) until it bot-
toms.

MAKE SURE ROLL PIN HAS BOTTOMED OR CARRIER MAY BE DAMAGED WHEN
PLANET SHAFT IS REMOVED.

2.

Remove Planet Shaft (3E) from Carrier (3A). Use a small
punch to remove Roll Pin (3G) from Planet Shaft (3E).

3.

Slide Planet Gear (3F) and two Thrust Washers (3B) out
of Carrier (3A).

4.

Remove both rows of Needle Bearings (3C) and Spacer
(3D) from bore of Planet Gear (3F).

5.

Repeat Steps 1 thru 4 for remaining Cluster Gears (3F).

Figure 3-25. Carrier Disassembly

3B

3B

3C

3D

3C

3F

3G

3E

3A

Advertising