Preventive maintenance & inspection schedule -3 – JLG 1230ES Service Manual User Manual

Page 25

Advertising
background image

SECTION 2 - GENERAL SERVICE INFORMATION

3121222

– JLG Lift –

2-3

Table 2-2. Preventive Maintenance & Inspection Schedule.

AREA ON MACHINE

INTERVAL

PRE-START (a)

INSPECTION

3 MONTH

PREVENTATIVE

MAINTENANCE

6 MONTH

PREVENTATIVE

MAINTENANCE

PRE-DELIVERY (b)

OR FREQUENT (c)

INSPECTION

ANNUAL (d)

(YEARLY)

INSPECTION

MAST ASSEMBLY
Mast Sections

2, 5

2, 5

Covers and Shields

1

Slide Pads

1, 2

PLATFORM ASSEMBLY
Platform

1

1

Guard Rails

1, 2, 4

1, 2, 4

Gate

1, 5

1, 5

Floor

1, 2

1, 2

Lanyard Anchorage Point

1, 4

1, 4

CHASSIS ASSEMBLY
Covers Installation

1, 7

1, 7

Static Strap

1

1

Wheel and Tire Assemblies

1

2, 15

2, 15

Drive Motors

1, 7, 9

Drive Motor Brushes **

FUNCTIONS/CONTROLS
Platform Controls

5, 6, 7

5, 6, 7

Ground Controls

5, 6

5, 6, 14

Function Control Locks, Guards, or Detents

5

5

Function Enable System

5

Emergency Stop Switches (Ground & Platform)

5

Function Limit or Cutout Switch Systems

5

Brake Release

5

Manual Descent or Auxiliary Power

5

5

POWER SYSTEM
Batteries

19

9

18

Battery Charger

5

HYDRAULIC/ELECTRIC SYSTEM
Hydraulic Lift/Steer Pump

1, 2, 9

1, 2, 5, 9, 25

Hydraulic Cylinders (mast and steering)

2, 7, 9

2, 9

Steer Cylinder Attachment Pins and Pin Retainers

1, 2

1, 2

Hydraulic Hoses, Lines, and Fittings

1, 9

1, 9

Hydraulic Reservoir, Cap, and Breather

5, 7

5, 7

Hydraulic Fluid ***

11

11

11

Electrical Connections

20

20

Instruments, Gauges, Switches, Lights, Horn

5