SECTION 4 - BASE COMPONENTS

4-22

– JLG Lift –

3121222

Spindle Sub-Assembly

Spindle Sub-Assembly

1. Using the appropriate pressing tool (T-207925), press in the 2 Main Bushings (12) in the upper bore of the Spindle

(1). The lower bushing needs to flush with the bottom of the bore and the upper bushing needs to be flush with
the bottom of the bore.

2. Using the appropriate pressing tool (T-182377), press on Main Bearing (14) until it is fully seated.

3. Insert the Motor Shaft Bearing (15) into the center bore of the Spindle (1). The bearing is a slight slip fit, but it may

require some press to assemble if the bearing becomes misaligned.

4. Retain the Motor Shaft Bearing (15) installing Spiral Retaining Ring (28) into groove in Spindle (1).

5. Use the Output Planet Pin (10) as a pressing tool to install the Planet Bushing (26) into the bore of each Planet

Gear (9). The shaft will help guide the bushing into the bore as well as prevent damage from the press.

6. Place Tanged Thrust Washer (32) into each planet "window" of the Spindle (1). Make sure the tang sits in the cast

groove on the inside of the window.

7. Place a Thrust Washer (25) onto the Output Planet Gear (9). Line up the bores as best as you can. Use grease to

hold the Thrust Washer in place.

8. Slide the Output Planet Gear (9) into the window with the Tanged Thrust Washer (32) until the bores line up.

9. Insert an Output Planet Shaft (10) into the Planet Shaft hole of the Spindle (1) and through the bores of the Thrust

Washers (25) & (32) and the Planet Gear (9).

10. Before pressing the Output Planet Shaft (10) into the Spindle (1), make sure the gear spins freely.

(continued next page)