5 steering linkage assembly - installation, 5 steering linkage assembly - installation -5 – JLG 1230ES Service Manual User Manual
Page 41
SECTION 4 - BASE COMPONENTS
3121222
– JLG Lift –
4-5
4.5 STEERING LINKAGE ASSEMBLY - INSTALLATION
Steering Linkage Assembly - Installation
(Shown with top of base frame weldment removed for illustrative purposes only)
1. Left Steering Knuckle Lug
2. Left Steering Arm Link
3. Right Steering Arm Link
4. Right Steering Knuckle Lug
5. Steering Cross Link
6. Hydraulic Steer Cylinder
7. Steer Cylinder Anchor Pin
8. Cross Link Anchor Pin
9. Steer Cylinder - Steer Right Port
10. Steer Cylinder - Steer Left Port
11. King Pin
12. Steering Knuckle Stop
NOTE: All pinned journals must have the proper bushings installed.
On final assembly apply Loctite #242 to screw threads of the steer cylinder anchor pin keeper screw.
On final assembly, apply Loctite #271 to the spindle to knuckle lug attach screws and torque to 70 ft. lbs (97 N,m)
1
8
6
9
10
3
7
12
11
5
4
2