Battery installation, 9 battery charger - installation, Battery installation -20 – JLG 1230ES Service Manual User Manual

Page 96: 9 battery charger - installation -20

Advertising
background image

SECTION 5 - CONTROL COMPONENTS

5-20

– JLG Lift –

3121222

Battery Installation

See Section-1 of this manual for battery specifications.

5.9 BATTERY CHARGER - INSTALLATION

The battery charger is located in the compartment at the
rear of the machine, remove the charger/step-plate cover
to gain access to the charger.

Left Side Battery Installation

1. Batteries
2. Bolt
3. Hold Down Clamp

4. Washer
5. Locking Nut
6. Attach Battery Temperature

Sensor To This Terminal

Right Side Battery Installation

1. Batteries
2. Bolt
3. Hold Down Clamp

4. Washer
5. Locking Nut

1

2

3

4

5

6

Battery Charger Assembly - Installation

1. Battery Charger Assembly
2. Attach Screws/Washers

3. AC Voltage - Input Cable
4. LED/Power/Interlock Cables

LED/Power/Interlock Cable - Identification

1. Charger Interlock Cable
2. DC Power Cable to Batteries

3. LED Indicator, Battery

Temp. Sensor Cable

Advertising