Motor assembly, Motor assembly -28 – JLG 1230ES Service Manual User Manual

Page 64

Advertising
background image

SECTION 4 - BASE COMPONENTS

4-28

– JLG Lift –

3121222

Motor Assembly

Motor Assembly

1. Insert motor (13) into back of the gearbox. Motor will pilot on the 4 bosses in the gearbox. Try to keep the end of

the motor shaft from causing damage to the lip seal in the gearbox.

NOTE: The motor may need to be rotated to line up the sun gear splines with the motor shaft splines.

2. Install the 2 Motor Mounting Bolts (M7) and Washers (M8). Tighten to 9-11 ft-lbs.

3. Connect the end of the power cable to the power controller, route cable per instruction in Figure 4-3.

4. Fill the gearbox with oil, See Oil Type & Capacity on Page 4-12.

Advertising