Lenze PC-based Automation Industrial PC User Manual
Page 28

Industrial PC | Parameter setting & configuration
Commissioning
Control elements
28
L
2.5 EN - 01/2012
How to start the function key assignment in the »Engineer«:
1. Highlight the corresponding Industrial PC in the project view.
2. Establish the online connection to the Industrial PC selected.
• Observe the chapter "Establishing the online connection to an Industrial PC" in
the »Engineer« documentation.
3. Click the Settings tab.
For every function key a selection list with different functions is available:
– The Start program option enables linking a function key to the start of an
application,
– Touch keyboard assigns the function key to the on-screen keyboard,
– Right mouse-click assigns the function key with the right mouse-click,
– Run AP script starts an automation panel script,
– Start control panel starts the Windows® CE control panel.
Alternatively the function key assignments can also be configured via codes C432 to
C439.