Step 1 step 2, Clip-loc – Metal Sales Clip-Loc Installation User Manual

Page 22

Advertising
background image

© Metal Sales Manufacturing Corporation/ Subject to change without notice/ Effective Date 2/03

812.246.1935 (Corporate Offi ce) • www.mtlsales.us.com

21

CLIP-LOC

1. If Floating Rake Zee is not used, go to STEP 2 else proceed.
2. Install Floating Rake Zee at all rake and rake parapet conditions. Square Floating Rake Zee to rake
condition.

It is critical that Floating Rake Zee be square to building as this will control

alignment of panels.
3. Fasten to decking with #12-14 x 1

1

/

4

" Shoulder Self Driller screws at 1'-0" o.c. Do not over tighten

screws for it is imperative that the Clip-Loc roof system be allowed to fl oat.
4. If two or more Floating Rake Zees are required, butt ends. Do not overlap Floating Rake Zees.

I

NSTALLATION

OF

P

ANEL

O

VER

D

ECKING

Note: Moisture barriers, Eave, Gutter, and Valley flashings must first be installed before panel
installation can begin (see pages 23-26). Clip-Loc panels can be installed going from either left or
right or right to left looking from eave to peak.
1. If Floating Rake Zee is not used, panel clips are required under fi rst panel, see STEP 3. Apply a row
of Double Bead Tape Sealant across Eave fl ashing approximately 2" from face of Eave fl ashing.
2. Properly align and install Clip-Loc Inside Closures to accommodate Clip-Loc panel rib alignment.
Closures must be lined up with panel ribs for proper seal. Do not apply tape sealant on top of closure.
3. If Floating Rake Zee is not used, square panel to rake condition. If Floating Rake Zee is used,
position the fi rst panel so female leg is on top of rake zee, panel ribs are aligned with inside closures,
and panel is at desired overhang. Additional overhang must be considered for wall panels.
4. Fasten through panel, closure, and sealant into decking with (6) #9-15 x 1

1

/

2

" Woodscrew XL fasteners

per panel. See pattern below. Fasteners must penetrate closure and sealant.

INSTALLING FIRST PANEL

INSTALLING FLOATING RAKE ZEE (OPTIONAL)

STEP

1

STEP

2

Square Floating Rake Zee to Rake

Fasten Floating Rake Zee with
Shoulder Self Driller (1'-0" o.c.)

Clip-Loc Panel

Square Panel to
Rake align with
Panel Closure

Clip-Loc Inside Closure

Clip-Loc Fastening Pattern

#9-15 x 1

1

/

2

" Woodscrew XL

(6) per panel

Advertising