Clip-loc – Metal Sales Clip-Loc Installation User Manual

Page 38

Advertising
background image

© Metal Sales Manufacturing Corporation/ Subject to change without notice/ Effective Date 2/03

812.246.1935 (Corporate Offi ce) • www.mtlsales.us.com

37

CLIP-LOC

H

IGHSIDE

P

ARAPET

O

VER

D

ECKING

1. Once panels have been installed, slide Clip-Loc Turn-up Tool over end of panel and bend pan up until flush with top of panel rib.
Turn up all Clip-Loc pans (see page 19).
2. Apply a row of Double Bead Tape Sealant across panel, up and over all ribs approximately 2"-4" from panel end.
3. Install a Clip-Loc Outside Closure over tape sealant. Before continuing make sure closure placement will accommodate SSR
Pitch Break flashing. Set closure in tape sealant.
4. Once all closures have been installed, place a row of Double Bead Tape Sealant across the top of closures.
5. Install SSR Pitch Break flashing, secure to Clip-Loc panel rib with a ¼-14 x

7

/

8

" Stitch XL 8"o.c. at every rib.

6. Install Counter Flashing, Reglet, or wall panel and fasten to parapet wall with appropriate fastener 1'-0" o.c. If Counter Flashing
or Reglet is used seal to parapet wall with tube sealant.
7. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of 2" placing a bead
of tube sealant between the flashings and securing with pop rivets 2

1

/

2

" o.c.

Double Bead Tape Sealant

#

1

/

4

-14 x

7

/

8

" Stitch XL (8" o.c.)

Clip-Loc Panel

Clip-Loc Clip

Moisture Barrier (by others)

Clip-Loc Outside Closure

SSR Pitch Break

Double Bead Tape Sealant

2"
MAX.

1:12 Slope
Minimum

INSTALLATION NOTES

Clip-Loc panel must be anchored to solid deck behind outside closure at all ridge, hip, endwall, and peak

conditions to fi x the panel when using this fl oating eave detail.

Advertising