Clip-loc – Metal Sales Clip-Loc Installation User Manual

Page 31

Advertising
background image

CLIP-LOC

© Metal Sales Manufacturing Corporation/ Subject to change without notice/ Effective Date 2/03

812.246.1935 (Corporate Offi ce) • www.mtlsales.us.com

30

R

AKE

P

ARAPET

(O

N

M

ODULE

) O

VER

D

ECKING

Clip-Loc Floating Rake Zee and Clip-Loc panels must be installed prior to rakewall installation (see page 21-22).
1. With Clip-Loc panel properly nested over top of Clip-Loc Floating Rake Zee, apply a row of Double Bead Tape Sealant across
top of panel rib.
2. Install Clip-Loc Rakewall flashing on top of panel rib. Fasten through Clip-Loc Rakewall, sealant, roof panel, and into Clip-
Loc Floating Rake Zee with ¼-14 x

7

/

8

" Stitch XL 1'-0" o.c.

3. Install Counter Flashing,Reglet,or wall panel and fasten to parapet wall with appropriate fastener 1'-0"o.c. If Counter Flashing
or Reglet is used seal to parapet wall with tube sealant. Do NOT fasten Clip-Loc Rakewall to wall.
4. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of 2" placing a bead
of tube sealant between the flashings and securing with pop rivets 2

1

/

2

" o.c.

Double Bead Tape Sealant

#

1

/

4

-14 x

7

/

8

" Stitch XL (1'-0" o.c.)

Clip-Loc Panel

Moisture Barrier (by others)

Floating Rake Zee

Clip-Loc Rakewall

12-14 x 1

1

/

4

" Shoulder Tech (1'-0" o.c.)

1:12 Slope
Minimum

INSTALLATION NOTES

Advertising