Clip-loc – Metal Sales Clip-Loc Installation User Manual

Page 28

Advertising
background image

© Metal Sales Manufacturing Corporation/ Subject to change without notice/ Effective Date 2/03

812.246.1935 (Corporate Offi ce) • www.mtlsales.us.com

27

CLIP-LOC

R

AKE

(O

N

M

ODULE

) O

VER

D

ECKING

Clip-Loc Floating Rake Zee and Clip-Loc panels must be installed prior to rake installation (see pages 21-22).
1. Position and install Cleat to wall with appropriate fastener, 1'-0" o.c. Make sure Cleat installation allows for proper Clip-Loc
Rake attachment.
2. With Clip-Loc panel properly nested over top of Clip-Loc Floating Rake Zee, apply a row of Double Bead Tape Sealant across
top of panel rib.
3. Install Clip-Loc Rake flashing by sliding open hem onto Cleat and resting the Clip-Loc Rake flashing on top of panel rib.
Fasten through Clip-Loc Rake, sealant, roof panel, and into Clip-Loc Floating Rake Zee with ¼-14 x

7

/

8

" Stitch XL 1'-0" o.c.

4. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of 2" placing a bead
of tube sealant between the flashings and securing with pop rivets 2

1

/

2

" o.c.

Double Bead Tape Sealant

#

1

/

4

-14 x

7

/

8

" Stitch XL (1'-0" o.c.)

Clip-Loc Panel

Moisture Barrier (by others)

Cleat

#10-12 x 1" PHW (1'-0" o.c.)

Floating Rake Zee

Clip-Loc Rake

12-14 x 1

1

/

4

" Shoulder Tech (1'-0" o.c.)

1:12 Slope
Minimum

INSTALLATION NOTES

Advertising