Crosshead load cell connector – MTS Criterion 40 - Manual User Manual

Page 79

Advertising
background image

Installing Cables

MTS Criterion

®

Series 40 Product Manual

Installation

79

Crosshead load cell

connector

For a single-testing zone material testing system, there is a connector for the load

cell under the crosshead on one of the columns. For an optional dual-testing zone

material testing system, there is a connector for the load cell under the top beam

on one of the columns, and there are two connectors for the load cell under the

crosshead on one of the columns. When using the upper testing zone, the upper

load cell is connected to the connector under the top beam on one of the

columns, and the two connectors under the crosshead are connected by a jumper

cable. When using the lower testing zone, the lower load cell is connected to the

back one of two connectors under the crosshead. Pin assignments are as follows:

P

IN

S

IGNAL

1

EX+

2

EX-

3

No Contact

4

FB+

5

FB-

6

No Contact

7

SHIELD

8

TEDS+

9

No Contact

10

EXS+

11

No Contact

12

RCAL1 (FBR+)

13

RCAL2 (FBR-)

14

TEDS-

15

EXS-

Lower Testing Zone Load
Cell Connector (Shown on
Model C44)

Criterion_product manual.book Page 79 Monday, July 28, 2014 3:52 PM

Advertising