Ni signal acquisition box mounting – MTS Criterion 40 - Manual User Manual
Page 80
Advertising
![background image](/manuals/568017/80/background.png)
MTS Criterion
®
Series 40 Product Manual
80
Installing Cables
Installation
NI Signal Acquisition
Box Mounting
The Model C45.504W frame can test with multiple load cells and multiple
channels. If this configuration is desired, an NI Signal Acquisition Box is
required. The typical mounting procedure follows.
1. Twist down all fasteners with the Allen wrench and remove the connector
cover from the base of the load frame.
Allen Screw
M4x8
Connector Cover
Criterion_product manual.book Page 80 Monday, July 28, 2014 3:52 PM
Advertising