Operating the control panel valves, Operating the control panel valves 15 – MTS Model 286-31 Transient Permeability Pore Pressure Intensifier User Manual

Page 15

Advertising
background image

Operating the Control Panel Valves

286.31 Transient Permeability Pore Pressure Intensifier

Operation

15

Operating the Control Panel Valves

Most of the steps in this section involve opening and closing valves on the
286.31’s control panel. The pictures that follow in this section will show you
which valves to open and close. The figure below is the key to these pictures.

A full turn opens a valve completely but still lets you shut it quickly. It takes only
light force to shut the valve completely, though using more force won’t hurt it.

Advertising