MTS Model 286-31 Transient Permeability Pore Pressure Intensifier User Manual
Page 74
Advertising
![background image](/manuals/568028/74/background.png)
286.31 Transient Permeability Pore Pressure Intensifier
74
Running a Transient Permeability Flow Test
Operation
9. Compress the Reference Volume 1 fluid some more to create the pressure
differential between Volumes 1 and 2.
On the RSC, turn the Manual Control to create the pressure differential you
want.
10. Isolate Reference Volume 1 from the Pressure Intensifier.
Turn the Permeability Fluid Input 1 valve to the Close position.
Advertising