Purge and fill the pore pressure lines, Purge and fill the pore pressure lines 49 – MTS Model 286-31 Transient Permeability Pore Pressure Intensifier User Manual
Page 49
Advertising
![background image](/manuals/568028/49/background.png)
Running a Steady State Flow Test
286.31 Transient Permeability Pore Pressure Intensifier
Operation
49
Purge and Fill the Pore Pressure Lines
1. Purge and fill the lower pore pressure line.
Turn the Pore Fluid Input valve to the Open position.
As soon as bubble-free fluid comes out at the triaxial cell’s lower pore
pressure port, go on to step 2.
Advertising