MTS Model 286-31 Transient Permeability Pore Pressure Intensifier User Manual
Page 68
Advertising
286.31 Transient Permeability Pore Pressure Intensifier
68
Running a Transient Permeability Flow Test
Operation
2. On the test controller, monitor the displacement sensor output.
3. Prepare to refill the Pressure Intensifier with fluid. Turn the Intensifier Fill
valve to the Open position.
4. Fill the Pressure Intensifier with fluid.
On the RSC, slowly turn the Manual Control to fully retract the
Intensifier’s piston.
Watch the displacement signal to make sure you have fully retracted the
piston.
Advertising