Purge and fill the low pressure reservoir line, Purge and fill the low pressure reservoir line 35 – MTS Model 286-31 Transient Permeability Pore Pressure Intensifier User Manual

Page 35

Advertising
background image

Purging and Filling the Fluid Lines

286.31 Transient Permeability Pore Pressure Intensifier

Operation

35

Purge and Fill the Low Pressure Reservoir Line

1. Prepare to purge the low pressure Fluid Reservoir line of air and fill it with

fluid.

Turn the Pore Fluid Output valve to the Open position.

Air in this line will come out at the Fluid Reservoir.

Advertising