MTS Model 286-31 Transient Permeability Pore Pressure Intensifier User Manual
Page 39
Advertising
Purging and Filling the Fluid Lines
286.31 Transient Permeability Pore Pressure Intensifier
Operation
39
2. Purge the reservoir return line of air and fill it with fluid.
Turn the Reservoir Return valve to the Open position.
As soon as bubbles stop coming out at the Fluid Reservoir, go on to step 3.
Advertising