286.31 Transient Permeability Pore Pressure Intensifier
34
Purging and Filling the Fluid Lines
Operation
3. Stop the flow to the triaxial cell.
Turn the Permeability Output valve to the Close position.
4. If your Triaxial Cell has an upper pore pressure valve, close it now.