Purge and fill the reference volume 1 lines, Purge and fill the reference volume 1 lines 26 – MTS Model 286-31 Transient Permeability Pore Pressure Intensifier User Manual

Page 26

Advertising
background image

286.31 Transient Permeability Pore Pressure Intensifier

26

Purging and Filling the Fluid Lines

Operation

Purge and Fill the Reference Volume 1 Lines

1. Prepare to purge the Reference Volume 1 lines of air and fill them with fluid.

Turn the Permeability Fluid Input 1 valve to the Open position.

Turn the Transducer Input 1 valve to the Close position.

Advertising