Running a steady state flow test, Running a steady state flow test 44 – MTS Model 286-31 Transient Permeability Pore Pressure Intensifier User Manual

Page 44

Advertising
background image

286.31 Transient Permeability Pore Pressure Intensifier

44

Running a Steady State Flow Test

Operation

Running a Steady State Flow Test

Running a steady state flow test has five major tasks

Fill the Pressure Intensifier

Purge and Fill the Pore Pressure Lines

Refill the Pressure Intensifier

Prepare to Run the Test

End the Test

Note

If you have just done a complete purge of the 286.31, skip ahead to

“Prepare to Run a Test”

on page 56.

Advertising