Purging and Filling the Fluid Lines
286.31 Transient Permeability Pore Pressure Intensifier
Operation
43
7. Prepare to pressurize the 286.31's lines.
Turn the Intensifier Fill valve to the Close position.
8. On the RSC, slowly turn the Manual Control to produce a positive
pressure.