Purge and fill the reservoir return line, Purge and fill the reservoir return line 38 – MTS Model 286-31 Transient Permeability Pore Pressure Intensifier User Manual

Page 38

Advertising
background image

286.31 Transient Permeability Pore Pressure Intensifier

38

Purging and Filling the Fluid Lines

Operation

Purge and Fill the Reservoir Return Line

1. Prepare to purge the Reservoir Return line of air and fill it with fluid.

Turn the Pore Fluid Output and Permeability Fluid Input 2 valves to the
Close position.

Air purged from this line will bubble out at the Fluid Reservoir.

Advertising