MTS Model 286-31 Transient Permeability Pore Pressure Intensifier User Manual

Page 18

Advertising
background image

286.31 Transient Permeability Pore Pressure Intensifier

18

Purging and Filling the Fluid Lines

Operation

2. If there is a specimen installed in the triaxial cell, remove it. Lines cannot be

purged and filled with a specimen in place.

You will find instructions for removing the specimen in your Triaxial Cell
manual.

3. Prepare to fill the Fluid Reservoir.

Turn the Pore Fluid Output, Pore Fluid Input, Permeability Output, and
Permeability Input valves to the Close position.

Advertising