Fill the pressure intensifier, Fill the pressure intensifier 45 – MTS Model 286-31 Transient Permeability Pore Pressure Intensifier User Manual

Page 45

Advertising
background image

Running a Steady State Flow Test

286.31 Transient Permeability Pore Pressure Intensifier

Operation

45

Fill the Pressure Intensifier

1. If you have a specimen installed in the triaxial cell, remove it now. Your

triaxial cell manual has the details on doing this.

2. Turn the valves to match the positions shown in the Step 3 picture.

3. Skip this step if the Reservoir is already 3/4 full.

Fill the Fluid Reservoir.

If your 286.31 is connected to a distilled water supply —

Turn the Reservoir Fill/Drain valve to the Open position.

When the Fluid Reservoir is about 3/4 full, turn the Reservoir Fill/
Drain
valve to the Close position.

If your 286.31 is not connected to a distilled water supply —

Remove the filler plug at the top of the 286.31.

Open the console’s rear door. Unscrew one of the hex–head plugs in the
Reservoir. (This allows air to vent more easily out of the Reservoir.)

Use a funnel to fill the Fluid Reservoir about 3/4 full.

Seal the filler cap and hex–head plug with Teflon thread sealing tape
and reinstall them.

Advertising