MTS Model 286-31 Transient Permeability Pore Pressure Intensifier User Manual
Page 79
Advertising
![background image](/manuals/568028/79/background.png)
Running a Transient Permeability Flow Test
286.31 Transient Permeability Pore Pressure Intensifier
Operation
79
5. Isolate the triaxial cell.
Turn the Permeability Output and Permeability Input valves to the Close
position.
6. If your triaxial cell has an upper pore pressure valve, close it.
Advertising