286.31 Transient Permeability Pore Pressure Intensifier
50
Running a Steady State Flow Test
Operation
2. Shut off the flow of fluid to the triaxial cell.
Turn the Pore Fluid Input valve to the Close position.
3. If your triaxial cell has an upper pore pressure valve, open it now.