0 offline test design, Offline test design – MTS Multipurpose Elite Test User Manual

Page 34

Advertising
background image

In this case, MPE is unable to automatically map the new controller resources to the test resources, and
shows validation error icons. To resolve the errors, you must manually map the controller resources to the
test, as shown.

Resource Validation Errors

Resource validation errors appear as red icons on the Resources tab. Validation errors occur when you
connect to a controller and MPE cannot locate controller resources that match test resource requirements in
the test definition. In this example, the names of the test resource control modes are “Disp 1” and “Load 1”.

If resources exist in the connected controller that have equivalent functionality but different names, you can
map them to the current test. To remap a resource, click the list icons in the Controller Resource column that
contains error icons and select compatible resources.

Import resources from an existing test

Before you begin manually entering test resource names, check to see if any other tests exist that have been
designed with the controller to which you intend to connect. If there are, import the resources from that test
first to save time. (Resources tab > Import Resources > Import resources from another test.)

4.6.0 Offline Test Design

You can design tests offline, that is, when disconnected from the controller and away from the station, and
then map resources when you connect to the station. You might find offline test design useful if you want to
design tests in your office or anywhere else outside of the lab. When you design tests offline, you do not have
to start the Station Manager application and open a station configuration before starting the MPE application.

The general workflow for designing tests offline is as follows:

1. Start the MPE application without starting the Station Manager application or connecting to a controller.

2. Click the Resources tab.

3. Manually enter test resource names.

4. Assign the test resources you created to test elements (such as activities, variables, and so forth).

5. Save the test.

6. Connect to a station.

7. Manually map the resources in the station to your test.

34 Multipurpose Elite Test Design Guide

4.0 Working with Resources

Advertising