b) In the Terminal Paths group of the Properties panel, select the Cycle check box. This causes the

Data Acquisition activity to end when the Cycle activity ends. The Parallel Path container is now set
up and ready to accept test activities.

4. Add the existing Cycle activity to the Parallel Path container by dragging the Cycle at Mean activity from

its current position to the area labeled “Drop Activities Here” in the Cycle path.

5. Add a Data Acquisition activity.

a) In the Toolbox panel and scroll to the Data Acquisition category.
b) Drag the DAQ activity from the Toolbox tab to the Acquire Data path of the Parallel Path container.

DAQ and Cycle Activities Added to Parallel Paths Activity

6. In the Properties panel, enter the following as necessary:

Data Acquisition Activity Properties

Value

Property

Acquire Time Data

Display Name

Trigger List

Note:

Click the Trigger List plus sign and use
the Data Acquisition Trigger Properties
window to set the value.

Trigger 1: Timed

Multipurpose Elite Test Design Guide 53