RKI Instruments SDM-2009 PC Controlled Configuration User Manual

Page 20

Advertising
background image

15 • Hardware Setup

GAS Tubing

Reference Figure 13 for the instructions below.

1.

Cut a 3-4” piece of 3/16 inch tubing for each GAS fitting on every SDM-2009
except the last one.

2.

Connect the tubing to the GAS fitting on every SDM-2009 except the last one.

3.

Insert the smaller T-fittings into the tubing so that the remaining two ports on
the T-fitting are perpendicular to the GAS fitting.

4.

Cut 6-7” pieces of 3/16 inch tubing and connect the T-fittings.

5.

Cut one more 6-7” piece of 3/16 inch tubing and connect the GAS fitting of the
last SDM-2009 to the T-fitting from the second to last SDM-2009.

6.

Cut 1 piece of 3/16 inch tubing long enough for easy access to the calibration
cylinder and connect it to the T-fitting on the first SDM-2009.

Advertising