RKI Instruments SDM-2009 PC Controlled Configuration User Manual
Page 55
Advertising
![background image](/manuals/571382/55/background.png)
Bump Testing a GX-2009 • 50
13. After the fresh air purge is complete,
•
If the bump test passes, the following window will open indicating that. The
BUMP
T
LED will be solid green. Click OK to return to the main program
window. The BUMP
T
LED will turn off.
Figure 36: Bump Test Passed
The GX-2009 will automatically be shut off 20 seconds after a successful
bump test.
Advertising