RKI Instruments SDM-2009 PC Controlled Configuration User Manual
Page 64
Advertising
![background image](/manuals/571382/64/background.png)
59 • Calibrating a GX-2009
10. After air is applied, and if all the channels passed the zero adjustment,
calibration gas will be applied. The GAS 1 indicator on the program screen will
come on. Calibration gas will be applied to the instrument(s) for 90 seconds.
Figure 44: Calibration Gas Flowing
The PC Controller Program will analyze the results.
Advertising