Rockwell Automation Publication 7000-IN007E-EN-P - June 2014
55
Drive Installation
Chapter 3
Power Connections
Ensure that interlocking with the upstream power source is installed and
functioning correctly.
Verify that all equipment power connections meet with local electrical codes.
The drive provides for cable lugs. The following table details the power terminals.
Table 4 - Incoming Connections
Power Cabling Installation Requirements
The following drawings illustrate:
•
a front view of the 900 mm input cabinet for AFE drives
•
typical line cable termination assemblies (18 Pulse)
Drives with AFE Rectifiers:
2U, 2V, 2W
Secondary (d0)
2U, 2V, 2W
Secondary (d-20)
3U, 3V, 3W
Secondary (d+20)
4U, 4V, 4W
Motor Connections
U, V, W